Here are the below SAP S/4 HANA post installation activities which need to be done after SAP S/4 HANA Installation.
Perform below S4HANA 1809 post installation steps
Perform a full database backup
Perform the automated initial setup
Call Transaction STC01
Choose the task list SAP_BASIS_SETUP_INITIAL_CONFIG
Choose Execute
Install the SAPLICENSE for Application and HANA Database
Configure the remote connection to SAP Support
Perform a consistency check – Run transaction SICK
Goto transaction DB13->Diagnostics->Missing tables and indexes
Configure Transport Management System (TMS)
Upload and set system profiles using transaction RZ10
Create logon and RFC server groups
Perform load configuration using SGEN – Generate all objects
Perform the client copy
Activate required Business functions
SMTP Configuration
Setup SAP Fiori